Logo

Anaerobic Treatment

Organisation ayant mis en oeuvre l'étude de cas

IFRC

Localisation

Cox's Bazar
Bangladesh

Principaux objectifs du traitement

BOD / COD Reduction
Nutrient reduction
Pathogen reduction

Coûts d'exploitation par débit réel d'entrée

5 USD/m³

Emprise au sol

0.02m²/personne

Ressources requises pour l'exploitation

Chemicals
Electricity

Technologies employées

Activated sludge
Anaerobic baffled reactor
Disinfection
Glass beads filter
Settling-thickening tank

Population cible

20 000personnes

Débit nominal entrant

10m³/jour

Investissement / débit nominal d'entrée

2 022.00USD/m3/jour

Origine des boues

Pit latrines affected by groundwater infiltraton

Produits sortants

Effluent
Sludge

Niveau de compétences

FSM specialist for construction
FSM specialist for design
FSM specialist for operation and maintenance

Débit réel d'entrée

22m³/jour

Diminution matière sèche (MS)

78 %

Diminution des DCO

88 %
Localisation

Cox's Bazar -
Bangladesh

Principaux objectifs du traitement
BOD / COD Reduction
Nutrient reduction
Pathogen reduction
Technologies employées
Activated sludge
Anaerobic baffled reactor
Disinfection
Glass beads filter
Settling-thickening tank
Population cible
20000personnes
Origine des boues
Pit latrines affected by groundwater infiltraton
Produits sortants
Effluent
Sludge

Time construction and commissioning

Diminution matière sèche (MS)
78.00 %
Coûts d'exploitation par débit réel d'entrée
5.00 USD/m³
Emprise au sol
0.02m²/personne
Débit nominal entrant
10.00m³/jour
Niveau de compétences
FSM specialist for construction
FSM specialist for design
FSM specialist for operation and maintenance
Diminution des DCO
88.00 %
Ressources requises pour l'exploitation
Chemicals
Electricity
Investissement / débit nominal d'entrée
2022.00USD/m3/jour
Débit réel d'entrée
22.00m³/jour

Description du contexte d'urgence

No more description

Description du processus de traitement

No treatment process description.

Évaluation et conception (faisabilité)

The anaerobic baffled reactor is used as pretreatment, to remove solids from the waste The plant is located next to a creek line that has been widened. It is a topography composed of plains and plateaus. The site has yet to be flooded, however potential flooding could occur in large rainfall event (e.g. 1 in 50 years).

Construction

Equipment package comes with 12 kVA genset and wiring for connection to renewable energy. Water is needed for inception and backwash. The aerator and oloid are coming from Germany, the Oxfam tanks are also imported from abroad. The construction lasts 2-5 days and the inception time is about 4 weeks or more depending on waste characteristics. The cost is $180,000 per treatment line ($9.00 per person) excluding works, plus local materials (e.g.fencing, gravel). It includes genset rather than renewable energy source. The skills required for set up and oversight is aerobic treatment expertise.

Opération et maintenance

The skills required for daily operation and maintenance is basic mechanical and electric skills & low skill labour. Water is needed for inception and backwash. A fully functional faecal sludge quality laboratory is a requirement for this unit. The cost is $5 per m3 treated, reduced with use of renewable energy. It excludes sludge transport cost. There is a 2.2m3 inflow every day, and 2.5m3 of output is produced every 3 days, with a 10% solids (100 kg / m3). The output sludge production in comparison to sludge input flow is 38 kg/m3. BOD is not measured. The COD average influent concentration is 23,600 mg/L and the COD average effluent concentration is 1,100 mg/L. The COD reduction is 88%. The faecal coliforms are fully removed due to current chlorination dosage. The average TS influent concentration is 22 g/kg and the outlet concentration is 5 kg//kg. The TS reduction is 78%. The average pH for influent is 8.1 and the average pH for effluent is 7.9. The helminth eggs average influent concentration is 266 eggs/g and the helminth eggs average effluent concentration is 3 eggs/g. The helminth eggs reduction is 98%. The unit does not produce strong odours or attract insects but the unit should be as far from settlement as possible while still allowing for efficient delivery of faecal waste. Washing facilities and PPEs are available. The site is fenced. Fencing and security are needed for health and safety and theft prevention. Drainage is implemented. An estimated 0.1 m3 of dried sludge and 10 m3 of treated wastewater is discharged per day (wastewater can safely be used for irrigation or added to a surface waterway).

Leçon apprise

Forces

- Odour and solid reduction
- Low land use
- Effective and efficient

Faiblesses

Fichiers de projet partageables

Ajouter un commentaire

The content of this field is kept private and will not be shown publicly.

Plain text

  • No HTML tags allowed.
  • Lines and paragraphs break automatically.
  • Web page addresses and email addresses turn into links automatically.
Image CAPTCHA
Saisir les caractères affichés dans l'image.

Ajouter un commentaire

The content of this field is kept private and will not be shown publicly.

Plain text

  • No HTML tags allowed.
  • Lines and paragraphs break automatically.
  • Web page addresses and email addresses turn into links automatically.
Image CAPTCHA
Saisir les caractères affichés dans l'image.